Monday, July 30, 2012

Pictures - with splashback!








Appliances in the earliest on Friday.  I remain hopeful that if not Friday not long after.  We really need handover soon because we have given notice to the real estate agent.  The bigger issues have been noted with the SS and the minor ones will be sorted after handover.


Friday, July 27, 2012

OK well tiles but no splashback

Expect photos in a couple of days when we do our first walkthrough.

The tiles arrived on Thursday and the tiler carted them down and started prepping that afternoon.  A decent amount of tiling was done by Friday afternoon although poor hubby spent ages tracking down some extra bags of the right kind of glue because the floor is so uneven he needed extras. 

Sadly no splashback, I was dying to take pic of it and see how pretty it (hopefully) is.

The remaining tiling will be done today and the grouting tomorrow, so no delay as a result of late start thankfully.

Hubby seems to believe handover could be as early as Wednesday.  Deliveries and carpet being orgnanised next.  We have someone designing the driveway.  Somehow we will manage the moving in despite the dirt drive.

Tuesday, July 24, 2012

Drama

Things have been going along quite well, the cleaners were in last Friday and as far as we can see inside is looking pretty good.  Little touch ups here and there needed but otherwise good.

We had the tiler for the main floors lined up to start on Monday.  Only he didn't.  He says the warehouse told him that something hadn't  been paid for.  Only it all has been.  He said if we get it sorted out he could start next Monday.  I think the M. site supervisor is tearing his hair out at that.  My husband just spoke to SS and he is going to speak to the tiling company.  SS goes away on holidays next week and he wanted handover to happen before then.

Thankfully the SS had the plumbers in yesterday to finish up some problem areas like putting in the right tap in the butler's pantry.  Sadly our yard is a bog so our nice clean house which was ready for tiling now has clods of mud in it.  Also the stairs have been stained so that's good too.

The splashback and possibly the appliances are due on Friday so that's exciting.  That's pretty much it.

We have a list of issues to be sorted - if it hasn't already been done.  For example we had an upstairs bedroom we wanted no internals in but the wardrobe people put them in there but not in the guest room downstairs which is where the internals were meant to be.  I hope they realised their error and fixed it.  The external paint is wrong too - I hope they mean to come back to touch up the paint job and while they are there they can paint the weatherboard and the portico in Stonecrop like it is meant to be.  Other than that it is mostly little things.

SS also said the person who seals in the tubs will be in next Monday.

So so so close.  Then we have the headache of getting a driveway sorted because there is no way we can get a removalist truck down to the house the way the sloping bog is at the moment.

Monday, July 16, 2012

Services!

Yesterday the electricians put in lights and switches.  We can live with the temporary lighting which is better than expected.  We will put in our choice of LED downlights, step lights, pendant lights etc over time after we have moved in. 

Big trench was dug today for phone, electrical etc.  I think the tiler and painter were also in there finishing up the insides.

Splashback, shower screens and wardrobes to go.  Possibly the air conditioning unit - we don't know if it went in yesterday or not.  We gave the tiler the go ahead from Fri/Sat to do the main floor tiles and hopefully we can get our carpet people in on Mon August 4th.




Monday, July 9, 2012

Still painting

I won't bore you with details - SS says they should be done by the end of the week. 

I noticed that the baths and WCs have been delivered.  So here's that exciting snap shot.



Hopefully there will be more to report by Monday next week.

Monday, July 2, 2012

I know I'm kind of due for another update

but the tilers have pretty much taken up all the time so there's not much new to report.  The painters were in on Saturday doing the ceilings and doors.  Second coat on upstairs ceilings are required but otherwise very nice job.  This is just a sneak preview of the finished tiling.





From what we can see the painters weren't here today but things have been moved around a bit including the garage door being left open so we checked it out. No one was on site but we noticed aircon vents were in. We made sure the place was locked up and closed the garage goor as we exited.

They also cleaned up the site a bit which helped us visualise our home a bit better.